The first version in the Haliade-X platform became the first offshore wind turbine to operate at 12 megawatts (MW) in November 2019. More than three years after revealing plans to build a monster offshore wind turbine called the Haliade-X, GE Renewable Energy has announced that the prototype of the latest and most powerful member of the family has started operating at 14 MW in Rotterdam, the Netherlands.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |